Empire Teknology successfully completed the turnkey installation of an 11 kV high-tension underground cable system along with a 250 kVA transformer for Uma Indus Gas, Heduva-Rajgarh, Mahesana, Gujarat.
What Makes Us Unique:
- Designed customized cable routes to fit the water park’s specific layout and existing infrastructure.
- Applied strong protective measures to guard cables against mechanical damage and moisture intrusion.
- Expertly integrated the underground cable network with the site’s transformer and distribution panels.
This project guarantees that Uma Indus Gas receives a dependable, high-quality power supply vital for seamless operations, improving both safety and operational efficiency.